Should the project require Factory Mutual insurance underwriting, the Specifying Professional for the project should consult with the FM Regional Engineer to determine any provisions they may require be met as part of the design of the structural system. The Specifying Professional remains responsible for the interpretation of these requirements on the job. The following guidelines outline Vulcraft's understanding of two possible approaches that may be taken concerning additional roof deck design requirements FM may require:
April 22-24, 2026
Georgia World Congress Center
285 Andrew Young Int'l Blvd NW, Atlanta, GA 30313
We’ve been hard at work creating solutions that enhance flexibility— and we can’t wait to share them with you at the NASCC: Steel Conference in Atlanta, Booth 1315.
NEW INNOVATION AT BOOTH 1315